Define the workload
We document the applications, performance priorities, workspace, displays, storage, cooling, appearance, budget, and upgrade path before recommending parts.
$100 for you + $100 for themReferral program
Refer a company — $100 in account credit for you and $100 for them. Referral program
Bringing the next part of the system into focus. The page structure is ready first; supporting details are arriving now.
From creator workstations and engineering systems to carefully planned performance builds, every component is selected against the approved workload, assembled part by part, tested under load, and handed off ready to use.
Bringing the next part of the system into focus. The page structure is ready first; supporting details are arriving now.
From creator workstations and engineering systems to carefully planned performance builds, every component is selected against the approved workload, assembled part by part, tested under load, and handed off ready to use.
From creator workstations and engineering systems to carefully planned performance builds, every component is selected against the approved workload, assembled part by part, tested under load, and handed off ready to use.
Start here
From creator workstations and engineering systems to carefully planned performance builds, every component is selected against the approved workload, assembled part by part, tested under load, and handed off ready to use.
Start here

Built part by part
Completed build, in motion
A silent sweep of the final loop, lighting, and glass-side finish.
The build sequence
Plan build verify
Step 01Loop, fitment, and cable paths are mapped before assembly.
Step 02Major components are fitted and checked in the open chassis.
A straightforward path from scope to launch.
We document the applications, performance priorities, workspace, displays, storage, cooling, appearance, budget, and upgrade path before recommending parts.
You review the exact component list, compatibility notes, supplier availability, labor, pass-through costs, warranty owners, assumptions, and exclusions before anything is ordered.
The system is assembled, updated, configured, cable-managed, and tested under load. Custom loops receive documented pressure or leak testing before final validation.
We finish the approved operating-system, driver, application, display, peripheral, and desk setup, then deliver the configuration and acceptance record.

Built part by part
Completed build, in motion
A silent sweep of the final loop, lighting, and glass-side finish.
The build sequence
Plan build verify
Step 01Loop, fitment, and cable paths are mapped before assembly.
Step 02Major components are fitted and checked in the open chassis.
A straightforward path from scope to launch.
We document the applications, performance priorities, workspace, displays, storage, cooling, appearance, budget, and upgrade path before recommending parts.
You review the exact component list, compatibility notes, supplier availability, labor, pass-through costs, warranty owners, assumptions, and exclusions before anything is ordered.
The system is assembled, updated, configured, cable-managed, and tested under load. Custom loops receive documented pressure or leak testing before final validation.
We finish the approved operating-system, driver, application, display, peripheral, and desk setup, then deliver the configuration and acceptance record.
What we support and how we deliver
We translate the workload and physical constraints into a compatible build, document the commercial split, assemble the approved parts, and verify the finished system before handoff.
Workload and specification
The specification starts with the applications, performance target, displays, peripherals, noise, thermals, space, serviceability, and upgrade horizon.
Parts and build control
Current part evidence and substitutions are reviewed before purchasing, while CORE's build labor remains distinct from pass-through component spend.
Validation and handoff
The completed machine is checked against the accepted build rather than handed over as an undocumented pile of parts.
Assessment before commitment. Brands and components are assessment-dependent examples, not partnership, authorization, inventory, performance, availability, or warranty claims. The accepted quote identifies the exact labor scope and the separately approved supplier-priced component costs. Custom liquid cooling, fabrication, data migration, software licenses, overclocking, shipping, on-site setup, and ongoing support are included only when expressly itemized.
Pricing and service options
Every build is quoted from an approved workload, component plan, and current supplier evidence. CORE labor and supplier-priced parts remain separate so the estimate stays reviewable.
Custom quote
Workload planning, component compatibility engineering, part-by-part assembly, configuration, burn-in testing, documentation, and handoff priced from the accepted build scope.
Current supplier cost, scope, quantities, licenses, taxes, and delivery terms are confirmed before approval.
Pricing, in plain terms
Planning, assembly, setup, and validation are custom-quoted against the approved configuration. Components, freight, taxes, licenses, specialty cooling, warranties, and other supplier costs stay itemized instead of being hidden inside the labor price.
One-time, recurring, usage-based, supplier-priced, and written-quote components stay on separate lines so unlike costs never blur together.
Tax, metered usage, media spend, provider licenses, hardware, shipping, and work outside the listed scope are identified before approval.
Plan my custom build
Tell us what the workstation needs to do, your parts preferences, and how much assembly and setup you want handled. Parts, assembly, testing, and handoff stay separate so the recommendation is easy to review.
Answer three quick questions. Nothing is added until you choose.
Plan my custom build
Tell us what the workstation needs to do, your parts preferences, and how much assembly and setup you want handled. Parts, assembly, testing, and handoff stay separate so the recommendation is easy to review.
Answer three quick questions. Nothing is added until you choose.
Quick fit guide
0 of 3 answered
Three quick questions and we'll point you at the right plan.
Choose the outcome or need first to receive a recommendation.
Choose the first planning step above. The recommendation and pricing explanation will update here—nothing is added to your estimate automatically.
Define the workload
We document the applications, performance priorities, workspace, displays, storage, cooling, appearance, budget, and upgrade path before recommending parts.
Approve every part
You review the exact component list, compatibility notes, supplier availability, labor, pass-through costs, warranty owners, assumptions, and exclusions before anything is ordered.
Build and validate
The system is assembled, updated, configured, cable-managed, and tested under load. Custom loops receive documented pressure or leak testing before final validation.
Set up and hand off
We finish the approved operating-system, driver, application, display, peripheral, and desk setup, then deliver the configuration and acceptance record.
Verify the work before you approve it
Custom Desktop Builds & Setup moves forward through a written scope, named inclusions, explicit exclusions, and an approval checkpoint. Review delivery examples alongside the recommendation—not instead of the scope.
See delivery evidenceStill weighing a detail?
Ask a specific question without losing the service, pricing, or recommendation context you selected above.
No. The build is quoted against the exact approved configuration. CORE planning, assembly, setup, and validation are separated from components, freight, taxes, licenses, specialty cooling, and supplier charges.
What we support and how we deliver
We translate the workload and physical constraints into a compatible build, document the commercial split, assemble the approved parts, and verify the finished system before handoff.
Workload and specification
The specification starts with the applications, performance target, displays, peripherals, noise, thermals, space, serviceability, and upgrade horizon.
Parts and build control
Current part evidence and substitutions are reviewed before purchasing, while CORE's build labor remains distinct from pass-through component spend.
Validation and handoff
The completed machine is checked against the accepted build rather than handed over as an undocumented pile of parts.
Assessment before commitment. Brands and components are assessment-dependent examples, not partnership, authorization, inventory, performance, availability, or warranty claims. The accepted quote identifies the exact labor scope and the separately approved supplier-priced component costs. Custom liquid cooling, fabrication, data migration, software licenses, overclocking, shipping, on-site setup, and ongoing support are included only when expressly itemized.
Pricing and service options
Every build is quoted from an approved workload, component plan, and current supplier evidence. CORE labor and supplier-priced parts remain separate so the estimate stays reviewable.
Custom quote
Workload planning, component compatibility engineering, part-by-part assembly, configuration, burn-in testing, documentation, and handoff priced from the accepted build scope.
Current supplier cost, scope, quantities, licenses, taxes, and delivery terms are confirmed before approval.
Pricing, in plain terms
Planning, assembly, setup, and validation are custom-quoted against the approved configuration. Components, freight, taxes, licenses, specialty cooling, warranties, and other supplier costs stay itemized instead of being hidden inside the labor price.
One-time, recurring, usage-based, supplier-priced, and written-quote components stay on separate lines so unlike costs never blur together.
Tax, metered usage, media spend, provider licenses, hardware, shipping, and work outside the listed scope are identified before approval.
Plan my custom build
Tell us what the workstation needs to do, your parts preferences, and how much assembly and setup you want handled. Parts, assembly, testing, and handoff stay separate so the recommendation is easy to review.
Answer three quick questions. Nothing is added until you choose.
Plan my custom build
Tell us what the workstation needs to do, your parts preferences, and how much assembly and setup you want handled. Parts, assembly, testing, and handoff stay separate so the recommendation is easy to review.
Answer three quick questions. Nothing is added until you choose.
Quick fit guide
0 of 3 answered
Three quick questions and we'll point you at the right plan.
Choose the outcome or need first to receive a recommendation.
Choose the first planning step above. The recommendation and pricing explanation will update here—nothing is added to your estimate automatically.
Define the workload
We document the applications, performance priorities, workspace, displays, storage, cooling, appearance, budget, and upgrade path before recommending parts.
Approve every part
You review the exact component list, compatibility notes, supplier availability, labor, pass-through costs, warranty owners, assumptions, and exclusions before anything is ordered.
Build and validate
The system is assembled, updated, configured, cable-managed, and tested under load. Custom loops receive documented pressure or leak testing before final validation.
Set up and hand off
We finish the approved operating-system, driver, application, display, peripheral, and desk setup, then deliver the configuration and acceptance record.
Verify the work before you approve it
Custom Desktop Builds & Setup moves forward through a written scope, named inclusions, explicit exclusions, and an approval checkpoint. Review delivery examples alongside the recommendation—not instead of the scope.
See delivery evidenceStill weighing a detail?
Ask a specific question without losing the service, pricing, or recommendation context you selected above.
No. The build is quoted against the exact approved configuration. CORE planning, assembly, setup, and validation are separated from components, freight, taxes, licenses, specialty cooling, and supplier charges.
Step 03Hard-line runs are measured, cut, and aligned part by part.
Step 04The cooling loop is tested before coolant and final power-up.
Step 03Hard-line runs are measured, cut, and aligned part by part.
Step 04The cooling loop is tested before coolant and final power-up.
Choose a published option or request custom scope. We confirm the final components, dependencies, exclusions, and price before delivery begins.
Choose a published option or request custom scope. We confirm the final components, dependencies, exclusions, and price before delivery begins.
Planning estimate
Build a preliminary estimate, or book 15 minutes to review requirements, exclusions, and next steps. Custom scope receives a fixed written proposal before work begins.
Prefer to talk it through first? Book a 15-min call
Planning estimate
Build a preliminary estimate, or book 15 minutes to review requirements, exclusions, and next steps. Custom scope receives a fixed written proposal before work begins.
Prefer to talk it through first? Book a 15-min call